Image

Sector

Electrical design

Title

Hydroelectric plant on the Avisio stream

Year

2016 - 2017

Client

LogoComuneLavis

Comune di Lavis

via G. Matteotti, 45

38015 Lavis (TN)

Description

Preliminary, definitive and executive design, safety coordination during the design and works management phase of a hydroelectric plant to be built on the hydraulic derivation of the Avisio torrent, currently used to power a turbopump serving the Lavis aqueduct.

Amount of works

IB.12              Euro           241.930,41 

D.03              Euro          152.880,25